Electron Run 3 2012
Week | SGM1 | SX700 | CD1 | Undulator Beamlines |
33 13/8-19/8 |
B. Domenichini | T.Boesen(Mo-We) /B.A.Wallace(Th-Su) | P. Hofmann | |
34 20/8-26/8 |
B. Domenichini | L.M.Nielsen (R&D) | D. Field | |
35 27/8-2/9 |
Astrid2 | Astrid2 | Astrid2 | Astrid2 |
36 3/9-9/9 |
G. Hughes | G. Hughes | Lei Liu(Mo-We)/ rSRCD(Th-Su) | D. Field |
37 10/9-16/9 |
G. Hughes | G. Hughes | T.Boesen(Mo-We)/ rSRCD(Th-Su) | P. Hofmann |
38 17/9-23/9 |
Shutdown for HPFI relay installation on beamlines | |||
39 24/9-30/9 |
Astrid2 | Astrid2 | Astrid2 | Astrid2 |
40 1/10-7/10 |
B.A.Wallace(Mo-We) /M.Luczkowski(Th-Su) | Justin Wells | ||
41 8/10-14/10 |
Astrid2 | Astrid2 | Astrid2 | Astrid2 |
42 15/10-21/10 |
D. Field | |||
43 22/10-28/10 |
P. Hofmann | |||
44 29/10-4/11 |
Astrid2 | Astrid2 | Astrid2 | Astrid2 |
45 5/11-11/11 |
T.Boesen(Mo-We)/ B.A.Wallace(Th-Su) | D. Field | ||
46 12/11-18/11 |
R.W.Janes(Th-Su) | P. Hofmann | ||
47 19/11-25/11 |
Astrid2 | Astrid2 | Astrid2 | Astrid2 |
48 26/11-2/12 |
A.G. Silva | G. Hughes | P.Kursula | D. Field |
49 3/12-9/12 |
A.G. Silva | G. Hughes | T.Boesen(Mo-We)/ B.A.Wallace(Th-Su) | P. Hofmann |
50 10/12-16/12 |
Astrid2 | Astrid2 | Astrid2 | Astrid2 |
51 17/12-23/12 |
*B.Gyurcsik(Mo-Th)/ R&D(Fr-) | D. Field |
Last Modified 15 August 2017