ASTRID2 Status
2015 |
||
24-26 March | Installation of the Landau Cavity and modification of ASTRID2 bumper 3. | |
2014 |
||
27-29 October | Modification of ASTRID2 bumper 2. | |
22-24 September | AU-IR beam line installed. | |
18-20 August | Modification of ASTRID2 bumper 1. | |
11th August | First users on the AU-CD beam line. | |
12th May | First users on the MatLine and SGM3/ARPES beam lines. | |
9th May | The AU-CD beam line has been installed on ASTRID2 and is under vacuum. | |
22nd April | CD1 is the final beam line to be removed from ASTRID. | |
2013 |
||
2nd December | First external user of ASTRID2 on the AU-UV beam line. | |
11th September | First User Beam. Commissioning of the AU-UV beam line starts, first spectrum recorded. | |
9th September | The design current of 200 mA has now been stored in ASTRID2. Top-up operation at 200 mA succesful. | |
28th August | Installation of the old ASTRID undulator (WUN131) in ASTRID2 | |
23rd August | 186 mA accumulated in ASTRID2 | |
16th July | Installation of the AMO undulator (WUN121) in ASTRID2 | |
12th July | Closed WIG121 (Multipole wiggler) to 13 mm with beam in ASTRID2. No degredation in injectino efficiency. A small chamber alignment error prevented closure of the gap to the noiminal 12 mm. | |
11th July | Stable top-up operation at 90 mA. The limit is still due to high temperatures in the bumper magnets despite upgrades. | |
11th June | FMH111 bumper upgraded with better chamber transitions and cooling | |
14th May | First light in a beam line. With only 1 mA of stored beam in ASTRID2 opened up the A2-UV1 beam line for initial tests. | |
30th April | FMH121 bumper upgraded with better chamber transitions and cooling | |
16th April | FMH161 bumper upgraded with better chamber transitions and cooling | |
6th February | The first beam line is now attached to ASTRID2. The final section of beam pipe for A2-UV1 was installed and the whole beam line is now under vacuum. | |
1st February | 155 mA accumulated current in ASTRID2. | |
7th January | 100 mA current stored in ASTRID2 for the first time! | |
2012 |
||
14th December | The new 2.5m undulator for the AMO beamline was delivered | |
12th December | A stored current of 36 mA in ASTRID2. | |
2nd November | The first stored beam with RF in ASTRID2! It was also possible to accummulate beam in the new ring. | |
10th September | The official opening of ASTRID2 by Morten Østergaard, the Danish Minister for Research, Innovation and Higher Education. | |
7th August | The electrons injected into ASTRID2 can now circulate the ring more than 1300 turns (200 microseconds). | |
10th July | First full turn around the ring! | |
29th May | The beam is now half way around the ring. | |
14th May | First beam in ASTRID2. | |
13th May | First beam through the transfer beamline. | |
11th May | RF Cavity for ASTRID2 has been delivered and installed. | |
10th May | The radiation wall around ASTRID2 is almost finished. | |
26th April | The transfer beamline between ASTRID and ASTRID2 has been completed and is under vacuum. | |
25th April | The radiation wall starts to go up around the ring. | |
20th April | All of the girders for the ASTRID2 ring are now under vacuum and have been baked. | |
6th February | Half of the ASTRID2 ring is now under vacuum and has been baked. Section 2 bakeout was completed today, section 3 baking will start this week. | |
2011 |
||
2nd November | Section 1 of ASTRID2 is now being baked. | |
21st October | First vacuum! Section 1 of ASTRID2 is now under vacuum. | |
20th September | The concrete blocks which will be used to build the radiation shielding are being placed in the basement. | |
26th August | Installation of the power cables for the dipole and quadrupole magnets commenced. | |
21st July | First section of the transfer beamline under vacuum, in preparation for further extraction diagnostics. | |
20th July | All girders for the ring have now been installed | |
6th July | First extraction of beam with ASTRID running in booster mode (22 second cycle time) | |
29th June | The first girder for the ring has been installed. Girder 2 has been placed on its supports. | |
28th June | First two girders for ASTRID2 delivered today | |
28th June | The first extracted beam from ASTRID | |
20th June | The multipole wiggler was delivered | |
April/May | The magnets for the transfer beam line were installed | |
23rd March | Supports for the magnet girders were put in place. | |
24th February | Gate valves for the ring were delivered. | |
18th February | The ion pumps for the ring were delivered | |
February | Utilities required for the ring are being installed. | |
7th January | Gate valves for ASTRID2 ordered | |
January | The ASTRID2 ring hall is empty and construction on the podium has started | |
2010 |
||
8th December | Ion pumps for ASTRID2 ordered | |
6th December | Main dipole chambers for ASTRID2 ordered | |
2th December | Extraction kicker for ASTRID received | |
February | Order of main power supplies for ASTRID2 | |
January | Multi Pole Wiggler (MPW) for ASTRID2 ordered | |
2009 |
||
7th September | Girders with magnets for ASTRID2 ordered | |
7th September | Fast magnets with power supplies for ASTRID2 ordered | |
August | Preliminary design report for the ASTRID2 ring sent out for review. | |
January | Design of ASTRID2 started | |
2008 |
||
December 2008 | ISA awarded money to build ASTRID2 | |
Construction
Current Status as of Friday 4th Janaury 2013: All of the ring is now under vacuum and has been baked. The RF cavity has been delivered and installed. Commissioning of the ASTRID2 ring is well underway with currents of around 30-40 mA stored.
By clicking on one of the links below you can view a video showing the construction progress of the ring. There is a short 20 second film which shows the complete construction of the ring from the beginning of 2011, when the ring hall was empty, until the ring was enclosed with a concrete wall in May 2012. The longer films show the daily progress of the construction and have been split into separate files according to year. The film for 2012 was last updated: 15th May 2012. The 2011 film shows the progress of the building of ASTRID2 throughout 2011. Some of the files are quite large.
.avi (mpeg4) file |
.mov file Quick time |
.wmv file Windows Media Player |
20 Second film | 20 Second film | 20 Second film |
2012 to 15th May | 2012 to 15th May | 2012 to 15th May |
2011 | 2011 | 2011 |
Below you will find a selection of photographs showing the progress with ASTRID2. Click on a thumbnail to view the picture in a larger version