Status of the ring:
The changeover is going as planned. The vacuum in the RF-cavity and the undulator chamber is looking good. All radiation shielding is in place, and we are ready for injections to begin except for the RF-transmitter, where work is going on to reduce an unwanted extra resonance.18/1 2000 / jsn