The microtron is getting ready for electrons again. We have had a lot of problems with the turbo
pumps. Two have failed completely, and the third had a roughing pump problem. We have
borrowed two pumps from the x-ray microscope, and KR is currently working on getting
everything under vacuum later today.
The microtron must be running well before week 32, when electron run 2/97 starts, and with
vacations etc, there is not much time left.